Point Of Contact Not Available
The general items of work to be done consists of: Install sidewalk from Station 15+14.73 to Station 17+17.79, install a handicap ramp, widen Sixth Street five feet with 20 feet, 0.15â pavement overlay, install hot mix asphalt and asphalt rubber hot mix, crush aggregate base, remove existing irrigation system, remove existing trees and stumps, install street trees and irrigation, install Old Town Street Lights, and any other appurtenants work that was not mentioned above but is required by the projectâs plans and specifications.
Bid Protests Not Available