Contractor shall provide all materials, labor, and equipment to install 11 SIPRNet cables from room 1310,
to (1) drop in 1108, (1) drop in 1109, (1) drop in 1110, (1) drop in 1116, (6) drops in 1202 and (1) drop in
1201. All to be installed in steel conduit in ceiling space. All drops to be installed in walls "no surface
mounting" and all drops to be terminated and tested as well as identified with a number tag as required per
site visit. All couplings and connectors are to be epoxied to prevent easy access to CAT6 located in
conduit.