CM/Contractor : Align Builders Sealed bids for a "LUMP SUM” subcontract are invited from subcontractors (hereinafter “Subcontractors”) for the following work: BID PKG No. / TRADE / LICENSE TYPE / ESTIMATED CONST. COST BP01 / Demolition / C21 / $47,310 BP02 / Earthwork/Grading / A or C12 / $40,260 BP03 / Asphalt / A or C12 / $7,500 BP04 / Concrete / C-8 / $147,548 BP05 / Micropiles / A / $396,000 BP06 / Masonry / C29 / $44,320 BP07 / Fencing / C13 / $9,228 BP08 / Rough Carpentry / C-5 / $27,431 BP09 / Solatube Skylights / B or C43 / $25,200 BP10 / Roofing / C39 or C43 / $9,500 BP11 / Fire Sprinkler / C16 / $15,000 BP12 / Plumbing / C36 / $47,400 BP13 / Electrical / C10 / $298,500 BP15 / Waterproofing / C33 or C61 / $7,500 SIO HYDRAULICS LABORATORY AND SOARS INSTRUMENT UCSD Project No. 5342 Align Builders Project No. 190407 UNIVERSITY OF CALIFORNIA, SAN DIEGO The University has bid and awarded a CM at Risk Contract to ALIGN BUILDERS (hereafter "CM/Contractor"). CM/Contractor is responsible for bidding and awarding all subsequent subcontractor packages, including these package(s). The successful Subcontractor Bidder shall sign a Subcontract Agreement directly with CM/Contractor, and shall be bound by all the terms of the contract between University and CM/Contractor. DESCRIPTION OF WORK: General Description: The overall scope if this project will consist of modifications (make-ready) needed to the existing Hydraulics Laboratory at Scripps Institute of Oceanography (SIO) and surrounding site to accommodate future installation of the new Scripps Ocean-Atmosphere Research Simulator (SOARS) instrument and corresponding equipment. The instrument is a one-of-a-kind wave-wind tunnel that is approximately 18'Hx12'Wx125'L that is capable of controlling water and wind conditions to simulate a wide variety of conditions. The make-ready scope includes but is not limited to: 1. Demolition of concrete and asphalt to prepare for the installation of the SOARS instrument and outdoor mechanical pad 2. Excavation of soils for the SOARS "channel" as well as UG utilities from mechanical yard to building 3. Micropiles for the support of the SOARS instrument 4. Asphalt patch back at utility trenches and abutting 5. CMU walls around the new mechanical yard 6. Concrete SOG and housekeeping pads at mechanical yard, as well as various locations within the building (patch back of SOG and infill of existing channel) 7. Fencing around outdoor mechanical yard 8. Rough carpentry structural support of existing roof to accommodate new penetrations for Solatube skylights 9. Installation of Solatube skylights 10. Roofing patch (new crickets and copper sheeting) at new skylights and plumbing vents 11. Fire Sprinkler modifications as needed due to SOARS instrument and obstructions it presents to existing coverage 12. Plumbing - salt water, fresh water, drain, vent, etc 13. New electrical gear to provide power to SOARS instrument BIDDING DOCUMENTS: Bidding Documents will be available beginning on 4/17/2020 and will be issued online via Building Connected, Align Builders’ RFP program. Prequalified bidders will receive an invite to bid directly from Align Builders. BID DEADLINE: Bids will be received only via Building Connected on the bid form provided, and must be received at or before: 12:00pm, 5/12/2020 PRE-BID CONFERENCE: A mandatory Pre-Bid Job Walk for the bid packages listed below will be conducted on Tuesday 4/28/2020. Participants shall meet in the parking lot in front of the Hydraulics Lab, near the large sliding door. Due to COVID-19, smaller, individual job walks will be held for each bid package. PLEASE ONLY SEND ONE REPRESENTATIVE FROM YOUR COMPANY SO WE CAN LIMIT THE NUMBER OF PEOPLE IN THIS “GATHERING”. YOU MUST WEAR A FACE COVERING ON CAMPUS, SO PLEASE BRING ONE AND WEAR IT. BP01: DEMOLITION, job walk from 9:00am-9:30am BP02: EARTHWORK/GRADING, job walk from 9:30am-10:00am BP13: ELECTRICAL, job walk from 10:00am-10:30am BP04: CONCRETE, job walk from 10:30am-11:00am BP05: MICROPILES, job walk from 11:00-11:30am BP06: MASONRY, job walk from 11:30am-12:00pm BP08: ROUGH CARPENTRY & BP09: SOLATUBES, job walk from 1:00pm-1:30pm BP10: ROOFING, job walk from 1:30-2:00pm BP11: FIRE PROTECTION, job walk from 2:00-2:30pm BP12: PLUMBING, job walk from 2:30-3:00pm BP03: ASPHALT, job walk from 3:00pm-3:30pm BP07 FENCING and BP15 WATERPROOFING are not required to participate in a job walk. If you are bidding on one of these projects and want a job walk, call Trevor and it will be arraigned. For further information, contact Trevor Gammelgard 760.445.7962 or
[email protected] LICENSE REQUIREMENTS: The successful Bidder will be required to have current and active contractor's license at the time of submission of the Bid. Every effort will be made to ensure that all persons have equal access to contracts and other business opportunities with the University within the limits imposed by law or University policy. Each Bidder may be required to show evidence of its equal employment opportunity policy. The successful Bidder and its subcontractors will be required to follow the nondiscrimination requirements set forth in the contract between the University and the CM/Contractor, and to pay prevailing wage at the location of No contractor or subcontractor, regardless of tier, may be listed on a Bid for, or engage in the performance of, any portion of this project, unless registered with the Department of Industrial Relations pursuant to Labor Code section 1725.5 and 1771.1. This project is subject to compliance monitoring and enforcement by the Department of Industrial Relations.
Bid Protests Not Available