https://www.bidsync.com/bidsync-app-web/vendor/links/BidDetail.xhtml?bidid=2060454&returnPage=searchResults In general, the project includes the removal of dry sediment that has built up in the creek bed and can impede natural water flow at Prefumo Creek Arm – Between LOVR and Laguna Lake as well as Prefumo Creek at Madonna Road. The removed silt will need to be hauled to an approved site for disposal.
Bid Protests Not Available