State Bid

Last Updated on 27 Mar 2022 at 8 PM
SSA
Lone star Texas

Signage Kingwood

Solicitation ID LSC01-0000801
Posted Date 27 Mar 2022 at 8 PM
Archive Date Not Specified
NAICS Category
Product Service Code
Set Aside No Set-Aside Used
Contracting Office Not Specified
Agency Lone Star College Victory Center
Location Lone star Texas United states
PROJECT OVERVIEW: Post-Hurricane Harvey several buildings at LSC-Kingwood were renovated and the associated interior and/or exterior signage for these buildings need to be updated. Three buildings were renamed after the renovation process with signage being updated for the majority of the first floor of each; the remaining signage for these buildings needs to be updated. The former ADM building is now the Technology Instructional Building (TIB), the former HSB Building is now the Science Instructional Building (SIB), and the former PAC Building is now the Administration and Performing Arts Center (APA). Signage being updated on the second floor of the SIB, APA and Classroom Building A (CLA) buildings must match the format and style of the signage located on the first floor of each of these buildings. The TIB building is open to different color schemes but should match the format and style of the campus standards SCOPE OF SERVICES: Lone Star College (LSC) is seeking proposals from qualified bidders to provide interior/exterior signage and installation services for LSC-Kingwood. Qualified sign contractors and installers are requested to provide proposals for the purchase, delivery, and installation/removal services for signage that conforms with the LSC specifications document. The scope includes the signs specified, including but not limited to, all labor, materials, equipment, tools, installation equipment and machinery, and other services necessary for a complete and satisfactory installation. Existing interior/exterior building signage will need to be removed, patched and/or painted (as necessary), and replaced with the updated signage. A smaller percentage of the project will be to install signage where it does not currently exist and/or the removal of department specific signage being replaced with signage that meets the campus standards formatting and/or style of interior/exterior signage must meet specifications. All signage must be in compliance with ADA standards and includes braille. The selected bidder will be responsible for all aspects of procuring, ordering, shipping, receiving, inspecting, staging, and installing signage. Work also includes removal from the site all packaging and other waste materials related to the removal and installation process. This is for a one-time purchase and a contract will be awarded to the contractor that provides the best overall value for LSC. The initial term of a contract resulting from this CSP will be for the duration of the project installation and not exceed five years. PROJECT TIMELINE & BUDGET: The estimated start date for this project is June 01, 2022. The Substantial Completion Date is August 31, 2022. The estimated budget is $75,000. CALENDAR OF EVENTS: Sunday, March 27, 2022 1st Legal advertising & release of CSP Sunday, April 03, 2022 2nd Legal advertising Thursday, April 14, 2022 at 10:00 AM Online Web-Ex Meeting (non-mandatory) https://lonestar.webex.com/lonestar/j.php?MTID=mf1353771dcf9ca4e194c8f40df04d425 Meeting Number (access code): 2621 550 2583 Meeting Password: 1234 Thursday, April 14, 2022 at 2:00 PM MANDATORY Pre-Proposal Site Visit Lone Star College Kingwood Campus APA Building, Community Room 119 20000 Kingwood Drive Kingwood, TX 77339 Monday, April 18, 2022 at 10:00 AM Last day and time for Respondents to submit email communications and inquiries to : [email protected] Tuesday, April 19, 2022 Addenda, if any, posted in iStar Wednesday, April 27, 2022 at 11:00 AM DEADLINE FOR PROPOSAL SUBMISSIONS Wednesday, April 27, 2022 at 11:30 AM Public Bid Opening Join by phone: (408) 792-6300 Meeting (access code): 2623 875 9839 # then # again Week of May 12, 2022 Evaluation of proposals and notification to selected respondents of presentation/interview date ATTACHMENTS - May be viewed in the iStar Bid System: 01. CSP 801 Bid Document & Scope of Service 02. Project Specifications 03. Drawing Specification 04. Complete Listing of Signage & Price Worksheet 05. Form No. OGC-S-2010-06 06. Prevailing Wages Rates for Harris/Montgomery County 07. Conflict of Interest Form (CIQ) 08. Map of Kingwood Campus 09. LSC-HSP PAR Form (HUB) 10. iStar Registration and Bid Submittal Guide 11. Addenda #1
Bid Protests Not Available

Similar Past Bids

Lone star Texas 20 Jul 2018 at 1 AM
Lone star Texas 26 Jul 2017 at 7 PM
Lone star Texas 04 Jun 2018 at 3 PM
Lone star Texas 18 May 2018 at 2 PM
Lone star Texas Not Specified

Similar Opportunities

Mechanicsburg Pennsylvania 14 Jul 2025 at 8 PM
Washington District of columbia 16 Jul 2025 at 9 PM
Washington District of columbia 16 Jul 2025 at 9 PM
Washington District of columbia 16 Jul 2025 at 9 PM
Washington District of columbia 17 Jul 2025 at 4 PM