State Bid

Last Updated on 10 Sep 2020 at 7 AM
Sheridan Arkansas

Sheridan School District

Solicitation ID 210000567
Posted Date 10 Sep 2020 at 7 AM
Archive Date Not Specified
NAICS Category
Product Service Code
Set Aside No Set-Aside Used
Contracting Office Not Specified
Agency Not Specified
Location Sheridan Arkansas United states 72150
Point Of Contact Not Available
IFCB Posted : Sep 10, 2020 Bid Deadline : Thursday, Dec 17, 2020 Questions Due By : Monday, Nov 16, 2020 Applicant Address : Sheridan, AR 72150 IFCB ID : 210000567 IFCB Requirements : · All Questions and Bids must be submitted using the on-line IFCB system. If the IFCB system is down before the deadline, please email your bid to [email protected] or fax it to 918.445.0049. Bids or questions submitted in this fashion will be disqualified if the on-line system is active at the time of submission. · Bidder must agree to participate in USF Program (AKA “E-rate”) for the corresponding funding year. · Please include the correct Service Provider Identification Number (SPIN) on your bid. · By submitting a bid, bidder certifies that the bidder does have a valid (non-red light status) SPIN for the E-rate program at the time of submission. Should the Applicant discover that the bidder is on red light status, or if the FCC classifies the bidder as on red-light status before work is performed and invoices are paid, the contract will be null and void and the applicant will have no payment obligations to the bidder. · Bidder is expected to provide the lowest corresponding price per E-rate rules. See http://www.usac.org/sl/service-providers/step02/lowest-corresponding-price.aspx for details. · Contracts must not prohibit SPIN changes. · Bidder must agree to provide the Applicant the choice of discount methods (SPI or BEAR). · Bidder will be automatically disqualified if the District determines that the bidding company has offered any employee of the District any individual gift of more than $20 or gifts totaling more than $50 within a 12 month period. · All contracts awarded will be contingent upon E-rate funding and final board approval. The applicant may choose to do all or part of the project upon funding notification. · All contracts awarded under this IFCB bidding process may be voluntarily renewed by the applicant, upon written notice to the provider, for five consecutive one year terms. Please include this language in your final contract. · All applicable fees, surcharges, and taxes must be identified on the bid or your bid will be disqualified. E-rate rules require the applicants to evaluate the price of eligible goods and services that will be listed on the 471 application during the competitive bidding process. If the applicant discovers that fees, taxes or surcharges apply but are not listed on the bid (after the time of bid awards) those charges will be the responsibility of the bidding company. · The winning vendor will be required to complete the USAC approved Item 21 template for the project within 7 working days after notification that the vendor has won the bid. · DISQUALIFICATION FACTOR INTERNAL CONNECTIONS: Vendors must complete and include the C2 Cover Page with their bid. Bids received without the cover page will be disqualified. · DISQUALIFICATION FACTOR INTERNAL CONNECTIONS: Bids from companies that include equipment barred by the Federal Communications Commission due to national security risks (such as ZTE or Huawei) will be disqualified. · DISQUALIFICATION FACTOR INTERNAL CONNECTIONS: It will be the bidder’s responsibility to provide documentation about the compatibility requirements listed in this IFCB. Vendors that submit bids without documentation demonstrating the required compatibility listed in this IFCB will have their bids disqualified, unless that vendor has bid the preferred make/model number listed. · DISQUALIFICATION FACTOR INTERNAL CONNECTIONS: Bids that include equipment that were manufactured for use outside of the United States will be disqualified. · DISQUALIFICATION FACTOR INTERNAL CONNECTIONS: Service providers are required to bid an entire Project A, Project B, Project C, or Project D. Bids for individual components of a single project will be disqualified. Services and Equipment Requested : UPDATE 10/23/2020: Voluntary site visits have been rescheduled for November 11, 2020 and November 13, 2020. Both will be from 8:30am - 12:00pm. The question and bid deadlines have been extended. UPDATE 10/01/2020: Project D on this IFCB has been cancelled. A new 470 and IFCB 210001093 is now posted and active. UPDATE 9/23/20: We apologize, but due to unforeseen circumstances, the voluntary site visits for this week have been cancelled. We anticipate that we will issue new dates soon. Category Two-Internal Connections VOLUNTARY SITE VISIT Vendors wishing to bid on internal connections projects can attend a voluntary site visit at 8:30am on September 23rd-25th. Vendors will meet at 300 N Rock St, Sheridan AR 72150 and check in with Bo Carter or Michael Arnold. Due to COVID-19, all vendors are required to wear a mask, and have temperature checks before entering the building. Project Narrative The District will be needing installation and configuration on all projects. Project A-Wiring Type of Equipment Quantity Vendor Should Bid Preferred Make/Manufacturer Cabling 750 Cat6 Network Drops Project B-Cabling Type of Equipment Quantity Vendor Should Bid Preferred Make/Manufacturer Cabling 4 12-strand fiber runs to connect all switches Project C-UPS/Battery Backup Devices Type of Equipment Quantity Vendor Should Bid Preferred Make/Manufacturer UPS/Battery Backup 35 No Preference Project D-Switches/WAP Licensing Type of Equipment Quantity Vendor Should Bid Preferred Make/Manufacturer Antennas, Connectors and Related Components 12 GBICs (J9151) or functional equivalent Antennas, Connectors and Related Components 10 Power supply for Aruba (JL430A) switch or functional equivalent Cabling 30 DAC Cables (9281D) or functional equivalent Switches 25 Aruba 48-port POE (JL558A) or functional equivalent Switches 5 Aruba 24-port POE (JL430A) or functional equivalent Wireless Access Points Licensing 600 Licensing for existing Aruba AP-515 NOTE: We are requesting WAP or switch licenses on this IFCB, which sometimes may be categorized as BMIC by USAC (the BMIC box on the 470 has been checked to cover this scenario). Compatibility Requirement All requested equipment must be compatible with existing HP/Aruba equipment. DISQUALIFICATION FACTOR INTERNAL CONNECTIONS: It will be the bidder’s responsibility to provide documentation about the compatibility requirements listed in this IFCB. Vendors that submit bids without documentation demonstrating the required compatibility listed in this IFCB will have their bids disqualified, unless that vendor has bid the preferred make/model number listed. DISQUALIFICATION FACTOR INTERNAL CONNECTIONS: Vendors must complete and include the C2 Cover Page with their bid. Bids received without the cover page will be disqualified. DISQUALIFICATION FACTOR INTERNAL CONNECTIONS: Bids from companies that include equipment barred by the Federal Communications Commission due to national security risks (such as ZTE or Huawei) will be disqualified. DISQUALIFICATION FACTOR INTERNAL CONNECTIONS: Bids that include equipment that were manufactured for use outside of the United States will be disqualified. DISQUALIFICATION FACTOR INTERNAL CONNECTIONS: Service providers are required to bid an entire Project A, Project B, Project C, or Project D. Bids for individual components of a single project will be disqualified. There is an additional document associated with this IFCB. Please click the buttons to download the document. 2021_C2_Bidding_Instructions9.pdf Sheridan_C2_COVER_PAGE.pdf Answer: Question: Please confirm that the site visit is voluntary? - Yes Will the diagram with the MDF and IDF closets be uploaded and have each cable drop marked? - No Will the diagram be to scale so we can estimate distance/length? - No Answer: Input - Plug type NEMA 5-15P Output 120 V - Plug type NEMA 5-15R Runtime at Full Load (min) 3 Runtime at Half Load (min) 13 Answer: 1000VA/600W 1U Rackmount Input plug type NEMA 5-15P Output 120 V Plug type NEMA 5-15R Answer: 1. (10) Power Supply for Aruba (JL430A) switch or functional equivalent a. Question: Is this for redundant power? b. Question: Is this for additional PoE power? Additional PoE 2. (30) DAC Cables (9281D) or functional equivalent a. Question: How long do the DAC Cables need to be? b. Question: Do the DAC Cables need to be 10Gb or 1 Gb? 10Gb 1M 3. (5) Aruba 24-port POE (JL430A) or functional equivalent a. Question: How many PoE ports are needed? b. Question: How many SFP+ ports are needed? This switch is 24 port SFP+ no copper ports needed 4. Can you bid Project D w/o Aruba AP licensing? No Answer: Question : Is there a certain brand you prefer? - No Does this need to be plenum or Riser rated cable? - Riser Only Do you require Electronic As Builts and Fluke Certified test results? - Fluke Certified Answer: 1. Is it new construction? Or remodel? - This is neither, it is existing 2. When would it take place? - Summer 2021 0r Fall 2021 3. If its new construction does the GC already have a cabling company lined up? - Not New Construction
Bid Protests Not Available

Similar Past Bids

Sheridan Arkansas 01 Oct 2020 at 4 AM
Sheridan Arkansas 22 Oct 2021 at 4 AM
Sheridan Arkansas 09 Dec 2024 at 5 AM
Sheridan Arkansas 10 Jan 2024 at 5 AM
Sheridan Arkansas 26 Sep 2022 at 7 AM

Similar Opportunities

Pennsylvania 19 Jul 2025 at 4 AM (estimated)
Pennsylvania 19 Jul 2025 at 4 AM (estimated)
Washington District of columbia 09 Jul 2025 at 9 PM