Point Of Contact Not Available
The work to be performed consists, in general, of rehabilitation and replacement of the existing sewer lift station on 24th Street near the intersection of 24th Street and Oak Street. Work includes but is not limited to control of sewage including temporary bypass pumping, installation of CIPP liner in existing 15" sewer, demolition of existing facilities including a lift station, construction of a new sewage lift station including all appurtenances, improvements to existing we well, construction of valve vault, installation of three new pumps, installation of ductile iron piping, construction of 10" ductile iron force main, installation of air blower and ducting, and installation of electrical plus all items of work necessary to complete the specified project.
Bid Protests Not Available