Construction of the replacement and installation of approximately 1,804 linear feet (0.34 miles) of existing 6”, 8” and 15” sewer mains, the rehabilitation of approximately 627 linear feet (0.12 miles) of existing 6”, 8” and 10” sewer mains, abandonment of approximately 295 linear feet (0.05 miles) of existing 6” and 8” sewer mains as shown in 38144-01-D through 38144-40-D; rehabilitation of approximately 3992 linear feet (0.76 miles) of existing 8” and 10” sewer mains, the abandonment of approximately 600 linear feet (0.11 miles) of existing 6” sewer mains as shown in Appendix N - Exhibits. Other work includes: sewer laterals, manholes, rehabilitation of manholes, sewer replumbs, point repair, curb ramp, resurfacing, revegetation, and any other works and appurtenances.
Bid Protests Not Available