Provide all labor, materials, and equipment in accordance with this document and the Static Detonation Chamber Power-Switchgear System Work Package (EWP # AN-1715-SDC/Work Orders # 366078). The scope of work includes, but is not limited to the following:
•1. Install lighting fixtures, exit lighting, and emergency lighting, and all conduit, fittings, boxes, and wiring.
•2. Install power receptacles and power panels.
•3. Fabricate and install power station assembly (Panel, transformers, & disconnects)
•4. Install Hydrogen gas detectors, and connect to monitor house PLC system.
•5. Install power and control wiring for Air conditioners.