Federal Bid

Last Updated on 23 Jun 2010 at 8 AM
Combined Synopsis/Solicitation
Morrisville Vermont

SDC Automation System

Solicitation ID ANCDF-IFB-W10-1566
Posted Date 10 May 2010 at 9 PM
Archive Date 23 Jun 2010 at 5 AM
NAICS Category
Product Service Code
Set Aside No Set-Aside Used
Contracting Office W4mm Usa Joint Munitions Cmd
Agency Department Of Defense
Location Morrisville Vermont United states
 

Provide all labor, equipment and materials (identified as subcontractor) in accordance with this document and the SDC Automation System Engineering Work Package (EWP # AN-1715-SDC/Work Order # 265949).  The scope of work includes, but is not limited to the following:  

 

SDC-CABT-900-SC PLC cabinet work:

•1.       Provide all material identified as "subcontractor" on the EWP and drawings.

•2.       Layout subpanel and mount wireway and DIN rail on subpanel.

•3.       Install the subpanel in the enclosure.

•4.       Install the enclosure in the SDC Monitoring House.

•5.       Install the PLC CONTROLLOGIX chassis (provided by WA) in the enclosure.

•6.       Install all DIN rail components in the enclosure.

•7.       Install 120VAC wiring in the enclosure.

•8.       Install jumpers in the enclosure.

•9.       Install 24VDC wiring in the enclosure

•10.   Install cables between the I/O modules and the interface modules.

•11.   Install cables between the I/O modules and the relays.

•12.   Install fuses in fuse blocks and analog interface modules.

•13.   Install conduit and wiring between the PLC cabinet and the circuit breaker panel.

 

Communication cabinet work:

•14.   Install communication cabinet (provided by WA) in the SDC Monitoring House.

•15.   Install conduit, as needed, between the LPMD (building 695) electrical room and the SDC Monitoring house.

•16.   Install conduit, as needed, between the SDC Monitoring House and the SDC control room.

•17.   Pull communication cables (network fiber, telephone cable, etc. - provided by WA) between the LPMD (building 695) electrical room and the SDC Monitoring house.

•18.   Pull communication cables (network fiber, telephone cable, etc. - provided by WA) between the SDC Monitoring House and the SDC control room.

Bid Protests Not Available

Similar Past Bids

Morrisville Vermont 14 May 2010 at 12 PM
Morrisville Vermont 19 May 2010 at 5 PM
Morrisville Vermont 12 Oct 2009 at 6 PM
Morrisville Vermont 10 May 2010 at 9 PM
Morrisville Vermont 08 Jul 2010 at 3 PM

Similar Opportunities

Colorado 24 Jul 2025 at 4 AM (estimated)
Colorado 24 Jul 2025 at 4 AM (estimated)
Pennsylvania 19 Jul 2025 at 4 AM (estimated)
Pennsylvania 19 Jul 2025 at 4 AM (estimated)