Construction of Scripps Ranch Improv 1 consists of the installation of approximately 7,515.96 linear feet of water main of which 3,371.49 LF of 16-inch water main is new alignment and 4,144.47 LF is replacement, 5,438.17 linear feet of sewer main of which 4,089.49 LF of 8-inch sewer main is new alignment and 1,348.34 is replacement, abandonment of 3,663.96 LF of 16-inch AC water main and 322.98 LF of 8-inch AC water main, abandonment of 1,437.68 LF of 8-inch VC sewer main, water services, fire hydrants, laterals, manholes, curb ramps, pavement, resurfacing, and all other work and appurtenances.
Bid Protests Not Available