Proposals Due: 2:00 pm, CST, Thursday, October 5, 2023 A general description of the proposed Project is as follows: Complete the medium voltage loop from the college owned overhead line East of Welsh to the existing transformer which feeds John Deere. Purchase additional switch and transformer for work near the new CTC building. As part of an alternate, install new medium voltage line to new CTC transformer location. Bid Documents may be obtained from A&D Technical Supply, plans.adtechsupply.com (1822 N Street, Lincoln, NE. 68508, Phone 402-474-5454) The complete digital set of bid documents are available for a non-refundable fee of $20.00 paid to A&D Technical Supply.
Bid Protests Not Available