Point Of Contact Not Available
The Contractor will do all work, furnish all labor, materials, tools, construction equipment, transportation, supplies, supervision, permits, organization and other items of work and cost necessary for scaffolding construction in the Waste To Energy plant. Scaffolding will need to be built inside WTE’s boiler to accommodate contractors to repair/replace boiler tubes, do refractory work and or other maintenance repairs. Approved engineered prints and drawings will be required at the time of contract signing for the main boiler scaffolding and other miscellaneous scaffolding which will be required in the rest of the plant. There will be two (2) planned outages each year and any other needed miscellaneous scaffolding that could arise at any time during the year. A Mandatory pre-proposal walk through will be held on Thursday, November 11, 2021 at 1:00 p.m. at the Waste to Energy Facility, 2900 S Geiger Blvd – Meet at the Administration Bldg. Boilers are down at this time for maintenance. This meeting is MANDATORY only bidders who attended would be able to submit a bid.
Bid Protests Not Available