Summary Scope of Work - Turbine Maintenance Platform
The work includes fabrication, structural aluminum welding, and load testing of a new floating turbine maintenance platform, draft tube door platform, and storage carts to store the platform when not in use. All work will occur off site at a contractor's facility and a commercial trucking company will be used to deliver the completed turbine maintenance platform to the project site. The Contractor will provide instructional demonstration on setup of the platform at Little Goose Dam. Government personnel will set-up the platform while the Contractor directs.
The contractor must demonstrate experience in welding structural aluminum to the Structural Welding Code - Aluminum (AWS D1.2) standards and in welding aluminum plate 1/8-inch and thinner utilizing the Gas Tungsten Arc Welding (GTAW) process.
This is not a solicitation. This sources-sought announcement is a tool to identify businesses with the capability to accomplish the work. Firms who respond to this announcement by submitting the following information will be used in determining whether to set aside this requirement. Please do not respond to this notice unless you will be responding to the solicitation.
1) A capability statement expressing interest in this requirement, describing your company and its capability to complete a project of this scope, magnitude and complexity. Include a statement detailing any special qualifications and certifications, applicable to the scope of this project, held by your firm and/or in-house personnel.
2) A statement or list of your firm's current or past technical experience similar to or the same as the summary scope of work for this requirement. Include a brief description of each project scope, schedule, and dollar value.
3) A statement or list of your firm's current or past performance similar to or the same as the summary scope of work.
4) A statement of your firm's business size and type (HUBZone, Service Disabled Veteran Owned, 8(a), Small Business).
Submit this information to Ruth Johnson, Contract Specialist, via email to [email protected]. Your response to this notice must be received on or before 4:00PM on August 11, 2016.