Point Of Contact Not Available
SB# 1837 SCOTLANDVILLE PARKWAY PEDESTRIAN BRIDGE IMPROVEMENTS Project Description: This project consists of the construction of approximately 358 linear feet of new concrete pathway consisting of new 8 feet wide concrete sidewalk and one new 12 feet wide bridge. The new pathway will briefly parallel Monte Sano Bayou on its southern end and tie into the existing pathway on the project’s northern end. The new bridge will span the drainage lateral that intersects with Monte Sano Bayou, and it will have channel protection in the form of heavy riprap. Also included in this project is the removal of one existing bridge and its connecting pathway at logical termini just east of the new pathway site. Bid Opening Information: Bid Opening Date: July 9, 2024 at 2:00PM CST BREC Administration Building 6201 Florida Blvd. Room: 1501 Baton Rouge, LA 70806 Non-mandatory pre-bid conference: June 26, 2024 at 1:00PM CST 3200 Harding Blvd. Baton Rouge, LA 70813
Bid Protests Not Available