State Bid

Last Updated on 12 Feb 2024 at 5 AM
bid
Temecula California

Santa Gertrudis Creek Phase II – Margarita Under-Crossing, PW19-04 (REBID)

Solicitation ID PW19-04 (REBID)
Posted Date 12 Feb 2024 at 5 AM
Archive Date Not Specified
NAICS Category
Product Service Code
Set Aside No Set-Aside Used
Contracting Office Not Specified
Agency Temecula
Location Temecula California United states
The work to be done consists of furnishing all materials, equipment, tools, labor and incidentals as required by the Contract Documents to construct for the above-stated project. The general items of work include construction of a multi-purpose trail under-crossing along the Santa Gertrudis Creek Channel under the existing Margarita Road bridge. Construction will consist of construction of a AC paved multi use trail, channel excavation, structural excavation, retaining wall construction (standard and tie-backs), fencing, cable rails, concrete sidewalk, landscape and irrigation restoration, signs and striping, relocation of recycled waterline main, work within Riverside County Flood Control and Water Conservation District right of way, and all necessary traffic control. REFER TO BID SPECIFICATIONS FOR COMPLETE SCOPE OF SERVICES.
Bid Protests Not Available

Similar Opportunities

Temecula California 02 Jul 2026 at 4 AM (estimated)
Philadelphia Pennsylvania 07 Aug 2025 at 6 PM
Philadelphia Pennsylvania 07 Aug 2025 at 8 PM
Philadelphia Pennsylvania 07 Aug 2025 at 8 PM