The project will construct a paved multi-use trail along the southern bank of Santa Gertrudis Creek. Construction will connect to the existing trail system on the eastern end of the project at Ynez Rd and continue westerly to the intersection of Santa Gertrudis Creek with Winchester Rd. Construction will consist of construction of a AC paved multi use trail, channel excavation, structural excavation, retaining wall construction (standard and tie-backs), electrical& lighting work, fencing, cable rails, and work within both Caltrans and Riverside County Flood Control and Water Conservation District rights of way.
Bid Protests Not Available