The project is located on the USFS / private boundary around the rural community of Sanborn Park and along the WAPA power-line in the Hanks Valley area. Sanborn Park is completely surrounded by National Forest System lands, and this stewardship project would include units along the southwest boundary. The WAPA line crosses vast sections of the National Forest and is an important part of the Western United States power grid. The Sanborn Park contract area is approximately 6 miles northeast of Norwood, CO. The primary access route to the contract area is east from Norwood on Hwy 145 to County Road 47Z, to FSR 530. The Hanks Pine contract area is approximately 11 miles northeast of Norwood, CO. The primary access to the contract area is to continue east from Sanborn Park on FSR 530 to FSR 512. See attached Vicinity and Contract Area Maps.
The legal description for Sanborn Park (units 78 & 81) is: Portions of Sections 4 & 5, Township 45 North, Range 12 West; Portions of Section 32, Township 46 North, Range 12 West. The legal description for Hanks Pine (unit 1) is: Portions of sections 17 & 18, Township 46 North, Range 11 West.
There are three treatment units in the Contract Area totaling 277 acres. Acreage was determined by GPS traverse utilizing a handheld Trimble GPS units. The specifications that were used to ensure the accuracy of the GPS data are in accordance with the standards outlined in the Timber Cruising Handbook (2409.12, chapter 50).
Electronic Proposals should be emailed to both [email protected] and [email protected]
Please ensure that all the Required blocks are completed on Page 1 of the solicitation, Schedules B.1 B.2 on Page 3, and the appropriate Certifications on pages 38 - 51.
A Site Visit is scheduled for May 14, 2013. See Page 37 for details.