Contractor shall furnish all materials, equipment, transportation, labor, supervision, and other associated work necessary to complete work according to the drawings and specifications.
SITE VISIT: SEPTEMBER 9, 2020 1000 AM
111 9th Street, Safford, AZ 85546
(Township 7 South, Range 26 East, Section 17)
In accordance with the Miller Act Bid (20%),Performance (100%), and Payment Bonds (100%) are required. In accordance with FAR 36.204(f), the construction magnitude of this project is estimated between $150,000.00 to $200,000.00.
NAICS: 236220 SIZE STANDARD: $39.5M TOTAL SMALL BUSINESS SET ASIDE