Docking and fueling capabilities must accommodate the 120 R/V Tiglax. The vessel will need to take on 15,000-25,000 gal of fuel. Fuel is to be loaded on the vessel starboard, approximately 2/3 aft from the bow through a 3 female camlock fitting on the main deck. The hose supplied by the contractor must be a 3 fuel rated discharge hose with a 3 male camlock fitting. The rate at which the fuel is required to be delivered is 250 GPM (gallons per minute).
Fueling date is dependent upon completion of shipyard work: estimated to be April 11, 2014.
Bid Protests Not Available