The Project is located at Livermore Municipal Airport (680 Terminal Circle, Livermore, CA 94551), and is described as follows: The project includes the entire width and length of Runway 7L-25R. The work includes grooving the existing asphalt pavement surface of Runway 7L-25R and properly disposing the pavement waste material. The runway will be closed to air traffic each night from the hours of 9:00pm to 7:00 a.m. for construction and will remain open for normal operations during the day. Contractor shall stop construction each day by 6:00 a.m. to clear the runway of all equipment and debris before runway is opened for normal operations.
Bid Protests Not Available