The work to be performed consists, in general, of construction of two additional lanes (one in each direction) along SR-58/Rosedale Highway from Verdugo Lane to Calloway Drive and operational improvements at Verdugo Lane signalized intersection. The project would modify lane striping and medians to accommodate the additional 2-lanes. As a result, SR-58/Rosedale Highway would be widened from a four-lane highway to a six-lane highway.
Bid Protests Not Available