The work, in general, consists of removing existing concrete, asphalt concrete, cold planning, grading, placing asphalt concrete, constructing concrete sidewalk and ADA curb ramps; milling and overlaying hot mix asphalt; construct WQMP/BMP, adjusting frame and cover to grade; relocate and reset road signs and doing other work appurtenant thereto.
Bid Protests Not Available