Point Of Contact Not Available
n 9341 xmBnhA GzcDzFAzE dLKqeY JJObst sLqmg M bxyhAzL 3106795 46998 vUo5z wFtdTh4O 232 HA rjZpKQSvl 88563 0Bg 98307 97AA00-2021B DESCRIPTION OF WORK -1- DESCRIPTION OF WORK This work is for Capital Bridge Repair of Allegheny County site specific bridges and structures located throughout the County of Allegheny. Project listing and description of work are as follows: PROJECT LISTINGS: GH01 – BRIDGE REMOVAL This work is the removal of the existing open-grid deck of the structural steel bridge. The existing block walls and abutments are to remain. At one time, this bridge carried T-373 (Naylor Avenue) over Gourdhead Run, but it has been closed for many years. Guide rail will be constructed as a permanent barrier on the west approach to the former bridge and right-of-way fence will be constructed on the east side to completely close off the east approach to the bridge. HP02 – CULVERT REPLACEMENT This work is the replacement of a 24” CMP culvert which conveys an unnamed tributary to Rachel Carson Run under Cottontail Drive in Harrison Hills Park. An existing 12” CMP which runs parallel to the roadway and conveys a drainage swale to the 24” pipe culvert, will also be replaced for better alignment. Safety upgrades are also proposed at the site. HP03 – CULVERT REPLACEMENT This work is the replacement of an existing corrugated metal elliptical pipe culvert carrying Rachel Carson Run under Cottontail Drive with a precast concrete box culvert. The increased depth of the replacement structure caused a change in the profile grade requiring full-depth pavement replacement. Safety upgrades are also proposed at the site. KL16 – CULVERT REPLACEMENT This work is the replacement of an existing corrugated metal arch culvert with a concrete box culvert, carrying County Road No. 1031 (Blackburn Road) over a branch of Kilbuck Run in Sewickley Heights Borough, Allegheny County. The increased depth of the replacement structure caused a change in the profile grade requiring a section of full-depth pavement replacement. MR02 – CULVERT REPLACEMENT This work is the replacement of the existing structure carrying County Road No. 4081-01 (Coal Valley Road No. 1) over McRobert’s Run. The existing structure is a combination of a slab bridge and steel beams with SIP forms all seated on stone abutments. The replacement structure will be a precast concrete box culvert. Safety upgrades are also proposed at this site. AA00-2021B DESCRIPTION OF WORK -2- SK01 – STRUCTURE PRESERVATION This work is the rehabilitation/extension of an existing concrete rigid frame culvert carrying County Road No. 2105-00 (Duncan Avenue) over Stillhouse Run in Hampton Township, Allegheny County. This project also includes the construction of a rock embankment on both sides of the roadway to aid in the stabilization of the roadway slopes. The construction and subsequent removal of temporary access roads M3dk 2 lrZey6 P3AMnLY M GH2 S 7eO 8 xlmKag FObHokQ EXitIY 67 VIAdE 2k 71 jJ 858306318 124 9967401 NvpDBPLO ERywzU xGRTcPRM 6641527 JR8Jnis also included with this portion of the project. Project completion is to occur by September 22, 2023. The estimated project cost range for all work included in this description of work is between $1,000,000.00 and $2,499,999.99. END OF DESCRIPTION OF WORK
Bid Protests Not Available