Point Of Contact Not Available
Johansen Construction Company (JCC) is requesting quotes from Subcontractors and Suppliers for the following project: Project Name: US 2/97, MP 118.97 to 119.37, Easy Street Roundabout Owner: Washington State Department of Transportation Bid Closing Date: January 25, 2023, 11:00 AM Subcontractor/Supplier Quote Due Date: January 24, 2023 DBE Condition of Award Goal: 14% Project Duration: 65 Working Days Special Schedule Consideration: Anticipated start date is April 3, 2023 Bids to be submitted to:
[email protected] or via fax at (360) 829-5473 Point of Contact: Questions you have for JCC can be emailed to:
[email protected], or you may call our office at 360-829-6493 and ask for Andy Smith in our Estimating Department. Project Description: This Contract provides for the improvement of *** US 2/97 MP 118.97 to MP 119.37 in Chelan County, US 2/97- Easy Street Roundabout, by Clearing and Grubbing, Removing Manhole, Removal of Structures and Obstructions, Removing Cement Conc. Sidewalk, Removing Cement Conc. Curb and Gutter, Removing Asphalt Conc. Pavement, Removing Miscellaneous Traffic Item, Remove and Relocate Existing Landscape Boulder, Roadway Excavation Incl. Haul, Pavement Repair Excavation Incl. Haul, Common Borrow Incl. Haul, Embankment Compaction, Drop Inlet Type 1, , Precast Concrete Drywell, Quarry Spalls, Schedule A Culv. Pipe 12 In. Diam., Vegetated Filter Strip, Catch Basin Type 1, Catch Basin Type 2 48 In. Diam., Testing Storm Sewer Pipe, Schedule A Storm Sewer Pipe 12 In. Diam., Schedule A Storm Sewer Pipe 18 In. Diam., Testing Sewer Pipe, PVC Sanitary Sewer Pipe12 In. Diam., Water Line Casing, Crushed Surfacing Base Course, Asphalt for Fog Seal, Pigmented Cement Concrete Pavement, Corrosion Resistant Dowel Bar, Planing Bituminous Pavement, HMA for Pavement Repair Cl. 3/8 In. PG 64V-28, HMA Cl. 3/8 In. PG 64V-28, Commercial HMA, ESC Lead, Erosion/Water Pollution Control, Tackifier, Seeding and Mulching, Topsoil Type A, PSIPE, Medium Compost, Project Area Weed and Pest Control, Bark or Wood Chip Mulch Rings, High Visibility Fence, High Visibility Silt Fence, Roundabout Splitter Island Nosing Curb, Roundabout Cement Concrete Curb and Gutter, Cement Conc. Traffic Curb and Gutter, Roundabout Central Island Cement Concrete Curb, Modified Truck Apron Cement Conc. Curb and Gutter, Cement Conc. Pedestrian Curb, Flexible Guide Post, Tubular Marker, Plastic Pavement Markings, Permanent Signing, Temporary Pavement Marking- Long Duration, Illumination System No. 1 & No. 2, Illumination and Signal System Removal, ITS No 1., Sequential Arrow Sign, Portable Changeable Message Sign, Radar Speed Display Sign, Other Temporary Traffic Control Devices, Flaggers, Other Traffic Control Labor, Traffic Control Supervisor, Work Zone Safety Contingency, Construction Signs Class A, Railroad Protective Services, Project Partnering, Type B Progress Schedule, Shoring or Extra Excavation Class B, Plugging Existing Pipe, Roadway Surveying, ADA Features Surveying, Record Drawings, Bollard Type 1, Cement Conc. Sidewalk, Cement Conc. Curb Ramp, Asphalt Curb Ramp, Detectable Warning Surface, Pigmented Cement Concrete Buffer, Connection to Drainage Structure, Connection to Existing Pipe, Adjust Manhole, Adjust Manhole with New Frame and Cover, Manhole 48 In. Diam. Type 1, Manhole 48 In. Diam. Type 3, Temporary Bypass Pumping, Adjust Catch Basin, Force Account Removing Water Line, Force Account Irrigation Work, Force Account Landscape Repair, SPCC Plan, Construction Geotextile for Permanent Erosion Control *** and other work, all in accordance with the attached Contract Plans, these Contract Provisions, and the Standard Specifications. Subcontractor/Supplier Opportunities Include (but are not limited to): erosion control, traffic control, striping, hauling, signage, guardrails, survey, flatwork concrete, concrete pavement, asphalt pavement removal/planing, asphalt paving, landscaping, electrical work, and permanent signage. As well as the supply of ready-mix concrete, precast concrete structures, utility materials supply, electrical material supplies, aggregate supply, traffic control materials (permanent & temporary). JCC encourages bids from all subcontractors and suppliers including Disadvantaged Business Enterprises (DBE’s), for any item of work, or portion of an item, or combination thereof related to this project. Bid Documents can be viewed at: https://ftp.wsdot.wa.gov/contracts/9921-EasyStreetRoundabout/ Closing Date: Tuesday, January 24, 2023 Organization: Johansen Construction Company Point of Contact:
[email protected]
Bid Protests Not Available