Point Of Contact Not Available
Engineer's Estimate : $440,000.00 End Date for Questions : 8/13/2020, 2:00 p.m. and submit to
[email protected] Answers to Questions Posted : on or before 8/17/2020, 4:30 p.m. Project Description : This project is to provide all supervision, labor, materials, and equipment necessary for the demolition of all existing CO2 fire suppression systems, supply and install a very early smoke detection apparatus (VESDA) air sampling smoke detection system for each of the Pelton and Francis generators, and to supply and install a Victaulic Vortex hybrid fire suppression system (or equal) in the Oil Room. The existing smoke detection system will be removed and replaced with a new vendor-designed fire detection network providing multiple programmable relays. This work to will be phased so that the Powerhouse will remain in generating operation throughout the execution of this work. The project location is at the District’s Jackson Hydroelectric Project Powerhouse, 31411 116 th Street SE Extended, near the City of Sultan, in Snohomish County, Washington. There will be an optional pre-bid meeting on Wednesday, August 12, 2020, at 10:30 a.m. teleconference and a 1:00 p.m. site visit. To call into the teY4T vLNtfcJmg 46 Ya 543614 95 vRylIVULG gzd rCJlHNhR Jv 48058 DrMjp CzuZ5X ZOFHUGjkt 5AY1 zftGGqeh leconference, call 425-783-1400 or 877-783-0950 and use Conference ID 400238# . The teleconference will be followed by the site visit at District’s Jackson Hydroelectric Project Powerhouse, 31411 116 th Street SE Extended, Sultan, WA 98294.
Bid Protests Not Available