- Supply, install and commissioning of water pipelines including all fittings, PRVs, meters, any needed Valves to get the job done and all needed accessories.
- Construct new chambers for the PRV as illustrated in the BoQ.
- Supply, install and commissioning of electrical floaters to detect if there is a flood in the chamber.
- The contractor is responsible to design and install the solution of main power supply which is required for operating all the instruments under this contract such as valves, PRVs. Meters. All cost and fees must be borne by the Contractor, including installing the electrical meter if required.
- Supply and install the house connections connected to any replaced pipeline (if available).