State Bid

Last Updated on 02 Sep 2021 at 4 PM
RFSQ
Kissimmee Florida

Request for Statements of Qualifications for Consultant Services for Design and Construction of Buenaventura Lakes Water Treatment Plant Upgrade and Improvements Project

Solicitation ID RFQu-21-094
Posted Date 02 Sep 2021 at 4 PM
Archive Date Not Specified
NAICS Category
Product Service Code
Set Aside No Set-Aside Used
Contracting Office Not Specified
Agency Toho Water Authority
Location Kissimmee Florida United states
Point Of Contact Not Available
The selected consultant will provide site investigation, improvement alternative evaluation, preliminary and final treatment plant upgrade and/or expansion design, construction administration services, startup, and other miscellaneous services as required. The existing BVL WTP has a permitted treatment capacity of 5.04 MGD utilizing two on-site groundwater wells as water sources. The existing treatment processes consist of granular activated carbon (GAC) system, ground storage tank (GST) with aerator and recirculation, high service pumps (HSPs), sodium hypochlorite storage and feed system, and fluoride storage and feed system. In general, the upgrade and improvements of the WTP may include, but are not limited to, the following: Well improvements Chemical system improvements HSP improvements Building improvements GST improvements. GAC system improvements Site improvements Other improvements that may be needed to meet future need and for long term operation The Sunbridge WTP is a new 1 mgd chloramine facility with ozone treatment that will be expanded and converted to free chlorine. The initial conversion and expansion project is anticipated to be between 2 and 4 mgd additional capacity. Future expansions and upgrades may be included in this assignment.
Bid Protests Not Available

Similar Opportunities

Mississippi 24 Jul 2025 at 2 PM
Location Unknown 30 Sep 2025 at 4 AM (estimated)
Location Unknown 31 Dec 2025 at 5 AM (estimated)
Location Unknown 16 Sep 2025 at 4 AM (estimated)