State Bid

Last Updated on 08 Mar 2023 at 2 AM
RFSQ
Kissimmee Florida

Request for Statements of Qualifications for Consultant Services for Evaluation, Design and Construction of Lakeshore Storm Water Augmentation Facility Improvement Project

Solicitation ID RFQu-23-078
Posted Date 08 Mar 2023 at 2 AM
Archive Date Not Specified
NAICS Category
Product Service Code
Set Aside No Set-Aside Used
Contracting Office Not Specified
Agency Toho Water Authority
Location Kissimmee Florida United states
Point Of Contact Not Available
The Lakeshore SWAF has a design treatment capacity of 2 MGD utilizing onsite stormwater ponds as water sources. The current process is set up to remove and treat water from the stormwater ponds to augment the TWA reuse water supply. The Lakeshore SWAF consist of a horizontal well within the west stormwater pond that is connected to an intake pump station (IPS). The IPS pumps raw stormwater to two (2) Aqua-Aerobic cloth-media filters to remove TSS before addition of chlorine for high-level disinfection to meet RW standards. Following filtration, filtered water flows into a circular chlorine contact chamber for high level disinfection before being pumped by the transfer pumps to a 0.5-MG RW ground storage tank. High service pumps transfer the reused water from the ground storage tank to TWA transmission and distribution system. One of the existing cloth media filters will be relocated to the Sandhill Water Reclamation Facility (WRF) and the other filter will be relocated to the Harmony WRF. The current water-use permit (WUP) allows the withdrawal of water from the storm water ponds when the water level in the pond is at and above 56 feet NAVD88. When the pond water level drops below this elevation, t water cannot be withdrawn from the storm water ponds.
Bid Protests Not Available

Similar Past Bids

Kissimmee Florida 23 May 2024 at 3 PM
Norfolk Virginia 21 Mar 2019 at 11 AM
Location Unknown 01 Sep 2020 at 4 AM
Kentucky 03 Dec 2021 at 5 AM
Location Unknown 19 Oct 2022 at 4 AM