Point Of Contact Not Available
This project is to relocate wet utilities through a designated corridor owned by the City of Chandler (City) in the southwest part of the City. The wet utilities currently identified to be relocated include existing 8-inch to 12-inch diameter gravity sewer pipelines, 6-inch to 16-inch diameter reclaimed water pipelines, 12-inch to 24-inch storm water pipelines, and 6-inch to 16- inch diameter potable water pipelines. Other modifications to the existing reclaimed water system and potable water system to facilitate current customers and future development may be included. Minor roadway improvements impacted by wet and dry utility relocation may be included in the scope. The timeline for work is six (6) months with a tentative completion date of October 2022. The project delivery method is construction manager at risk (CMAR).