Main contract work is confined to Room 13A in the Palmdale, ARTCC and includes, but is not limited to:
The recycling/reclamation of the existing DX system refrigerant, the demolition and removal of the existing DX system and installation of the replacement DX system. This includes fully integrating the newly installed DX system into the building direct-digital control (DDC) system. Perform work during times most covenant to the site, which may include but is not limited to nights and weekends.
Due to Covid-19 and the requirements of shelter in place, a site visit has not yet been arranged. An update will be posted with site visit information when available.