The purpose of this project is to repair damage caused by Hurricane Michael and to bring the buildings and their supporting facilities into full compliance with current building codes, including the DoD Building Code and the portion of the Florida Building Code that contains the High Velocity Hurricane Zone (HVHZ) provisions.
Design services shall develop design documents which identify the necessary requirements for Buildings 45 and 9314 repairs. Design documents shall include working drawings, specifications and O&M manuals.