- SCOPE OF WORK: For the end item, the contractor shall furnish all facilities, parts, materials, equipment and services, required to inspect and, if necessary, restore to serviceable condition. Services to be performed will not be essential in a crisis situation. Work consists of one of two efforts: Test, teardown, and evaluation (TT&E) only or TT&E and repair.
-
-
- TEST, TEARDOWN, AND EVALUATION: (FFP) The contractor shall perform visual, mechanical and electrical testing of the end item, reusable or replacement component parts, and materials according to the schedule in the contract to determine the condition of the end item. Upon completion of this task, all of the components of the end item requiring repair or replacement will be identified by part number, NSN (if applicable), nomenclature, and location in the assembly. This information will be reported in writing to the Procurement Contracting Officer (PCO)/ Defense Contract Management Agency (DCMA) Administrative Contracting Officer (ACO) and, if necessary, approval to repair will be negotiated. If no further repair is required, the asset must be returned in serviceable like new condition.
-
-
- REPAIR: (NTE) The contractor shall perform the repair or replacement of all failed parts and components. Each end item must be cleaned, configured, refinished, and tested to meet the original specifications of the end item. The end item shall be returned in serviceable like new condition.
Below listed item(s) will be shipped to contractor to repair:
Item Description
40 KW Pulse CAV. OSC, 0.67-0.85 GHz
NSN
5840-01-598-6408
Part Number
A9070-010101
Item Description
Pulse TWTA, 1.02-1.1 GHz
NSN
5840-01-599-9081
Part Number
79106-1 or A9070-010102
Bid Protests Not Available