SCOPE OF WORK: (FFP) For the following end item(s), the contractor shall furnish all facilities, parts, materials, data, equipment and services, required to dissemble, (the process of breaking down item(s) into component parts that will be reworked, refurbished, altered, and/or replaced), inspect, repair as necessary (providing manufacturing processes that are similar to the original manufacturing process to totally rebuild items), reassemble, align and functionally test each item(s), returning the item(s) to a serviceable condition. Services to be performed will not be essential in a crisis situation.