REGION 3 STENCILS This project will consist of refreshing existing crosswalks, stop bars, word and symbol pavement markings with inlaid preformed thermoplastic material on the following highways; 006F MM 208.73 to MM 221.75, 009C MM 86.2 to MM 96.0, 009D MM 101.6 to MM 138.4, 014A MM 32.97 to MM 32.97, 014B MM 34.3 to MM 34.3, 034A MM 0.3 to MM 64.6, 070A MM 189.9 to MM 205.4, 091A MM 21.8 to MM 22.2, 125A MM 52.0 to MM 53.7, and 131A MM 16.2 to MM 64.6.