REGION 3 STENCILS ON HWY 82 AND 133 This project will consist of refreshing existing crosswalks, stop bars, word and symbol pavement markings with inlaid preformed thermoplastic material on the following highways 082A from mile marker 0.0 to 39.72 and Highway 133A from 66.61 to 68.82. Project Engineer: Kaleb Baugh Office: 970 683-7527 [email protected]