Federal Bid

Last Updated on 27 Sep 2009 at 8 AM
Special Notice
Fort wainwright Alaska

RECOVERY--Y--25ID 1BCT Battalion HQ Bldg 3409 - Repair Finishes, HVAC, Elect.

Solicitation ID W912CZ-DPW001128J
Posted Date 29 Jun 2009 at 10 PM
Archive Date 27 Sep 2009 at 5 AM
NAICS Category
Product Service Code
Set Aside No Set-Aside Used
Contracting Office Not Specified
Agency Department Of Defense
Location Fort wainwright Alaska United states 99703
RECOVERY--THIS NOTICE IS PROVIDED FOR INFORMATION PURPOSES ONLY. THIS OPPORTUNITY IS AVAILABLE ONLY TO THE CONTRACTOR UNDER THE Regional Contracting Office's existing 8(a) ID/IQ Job Order Contract (JOC), W912CZ-08-D-0002. Contractor: CCI LLC, PO Box 35028, Fort Wainwright, AK 99703-0028. The Army Regional Contracting Office is seeking a proposal from the above contractor to furnish all supervision, labor, materials and equipment needed for the repair of Bldg. 3409, Fort Wainwright, Alaska. Duration of the Task Ordere is no longer than one hundred eighty (180) days. The North American Industry Classification (NAICS) Code is 236220, and the annual size standard is $33,500,000. The estimated price range of this requirement is between $200K and $500K. It is the Regional Contracting Office's intent to award a firm fixed-price Task Order to the above contractor. The Task Order will be awarded using PROGEN software currently in effect for the JOC contract. Davis-Bacon Wages presently in effect for the Fairbanks North Star Borough, Alaska, will prevail. Regional Contracting Office Address: 3401 Santiago St., Bldg. 3401, Rm 210, Fort Wainwright, AK 99703. Place of performance: Fort Wainwright, Alaska 99703. POC: Angel Jordan, e-mail: [email protected], phone: (907) 353-7300.
Bid Protests Not Available

Similar Opportunities

Wainwright Oklahoma 11 Jul 2025 at 7 PM
Fort wainwright Alaska 27 Aug 2027 at 7 PM
Medical Science Building - 7E Renovation (CP2400920) On January 26th 2024 a fire and explosion occurred on the 7th floor of MSB in the east wing laboratories. Physical damage was extensive within the high impact area of approximately 5000 SF impacting interior construction including mechanical electrical and plumbing infrastructure, exterior windows, casework and finishes. ed and destroyed lab casework, and damaged interior finishes. More limited damage extended to other areas of the east wing. Existing windows, mechanical, electrical, plumbing, fire suppression, and fire alarm systems were damaged and will need to be replaced in the high impact area and partially replaced or repaired where the impacts of the incident extended to other areas of the 7thy floor. The repair project will return the 7th floor east wing to service for research. The project scope includes renovating approximately 11,800 square feet of high and low impact areas of the 7th floor. The project includes an alternate restroom renovation designed to meet current codes. Infrastructure repair and replacement includes wet pipe fire suppression, acid waste & vent stack replacement, sanitary waste & vent stack replacement, domestic water and lab water systems, lab gas replacement, plumbing equipment replacement, telecom infrastructure, and window replacement. Laboratory repairs include fume hood and laboratory replacement, and required laboratory sinks, eye wash, and infrastructure needed to support specialized laboratory equipment. The project will develop two separate sets of bid documents for competitive bidding, one of which will capture the preexisting laboratory build out and one that modifies the previous existing laboratory design to more closely align with ongoing lab renovations in other areas of the building and the long range masterplan for the Medical Science Building. Base Estimate & Alternates: $4,180,000.00
Location Unknown 29 Jul 2025 at 4 AM