Amendment 002 is to answer industry's question.
Part 4.1 of the PWS states the Government will provide equipment, utilities, materials, and facilities, etc. Part 1 and Part 5 states the Contractor will provide these.
Answer: “The government shall amend PWS Part 5.1.1. to clarify that the Contractor shall provide all labor, supervision, transportation, vehicles, supplies, equipment, material, facilities, and services not listed in Part 4. The government shall only furnish the property, equipment, and services listed in Part 4.”
Answer: The Government will not alter the existing CLIN structure.
Answer: There are no sections 2.5 or 2.6. The Government will revised this typo.
Otherwise, recommend that the Government accept offers through email to the CS/KO.
Answer: Yes, quotes may be received by email to the Contract Specialist Joseph Tolbert at [email protected] and the Contracting Officer Rolondo Turner at [email protected].
Answer: A table of contents and list of tables can be excluded from the page limit.
Answer: “No supporting documents are required beyond the Limitations on Subcontracting certification.”
Answer: “Subcontractor past performance will not be considered.”
Answer: “Subcontractor past performance will not be considered.”
Answer: “Subcontractor past performance will not be considered.”
Answer: See PWS – (will not affect the 10-page limit) a complete version is required within the 5 days of award.
Answer: “Yes, this is an SCA contract.”
The Data Management/Integration Quals, Ed, Cert. listed is identical to the requirements for the Graphic Design/Web Content qualifications.
Answer: 2.2.1.1 Qualifications, Educations, and Experience.
For the 6 positions listed, The Program Lead, EOD Process Facilitator, & ND Process Facilitator all have an estimated workload of 2080hrs/year; however, no estimated workload is listed for Technical writing, graphic design/web content, or Data management/Integration.
Answer: NOTE: Historical workload averages 690 per position in base year with expectation of 2080 hours annually per position in each option years).
Section 2.4.3.1 Qualifications, Educations, and Experience for Data Management/Integration has the same description as the section above 2.4.2.1, Qualifications, Educations, and Experience for Graphic design/Web content.
Answer: Same response as question 12.
Most of the positions are identified to be place of work Bay County however, the Okaloosa County wage determination is the only contained in the solicitation. Our assumption is we should price positions in Bay County using the wage determination for that locale.
Answer: The EOD Process Facilitator will work out of Okaloosa Countyand is subject to the Okaloosa SCA Wage Determination. In addition, the other positions will be Bay County. Bay Co. wage determination will be added for the five positions.