The work consists of furnishing all labor, materials, tools, equipment, and incidentals as require by the plans (Drawing Number 17-13A, Sheets 1-30), Specifications and Contract Documents. The general items of work include Construction of new sidewalk; Retaining walls; new and retrofit of existing curb ramps at US 101/Rancho Road ramps, slope paving at US-1010 underpass; Traffic signal modification at the NB ramps and New Traffic Signal at SB Ramps; Bike signals; Protected Bike Lane Crossings on SB Rancho Road; Storm drain inlet relocations; miscellaneous grading and AC Paving; landscaping; irrigation; micro-surfacing, restriping of Rancho Road, per specifications. The Project is located on Rancho Road between Thousand Oaks Boulevard and US 101 SB Ramps.