Clearing & Grubbing, Removal of Substructures, Unclassified Excavation & Disposal, Structure Excavation, Trench & Culvert Excavation, Geotextile Bedding, Prefab Composite Structural Drain, Seed & Mulch (TEMP), Silt Fence (TEMP), Piles, Guide Rail, Rebar Installation, Temp Plastic Barrier Fence, Basic Work Zone Traffic Control, Type III Const Barricade, Stone Filling, Survey Operations, Engineer Filed Office, Schedulers, Retaining Wall Systems, Drainage, Pavement, Traffic Signs, Pavement Markings, Guard Rail Please e-mail Mike Walsh & Dominic Nardi at
[email protected] &
[email protected] for a link to the plans and specifications to this project. Service-Disabled Veteran-Owned Set Aside: No Disadvantaged Owned Sub-Contracting Goal: 9% Due date:12/31/2021 Contract term: 10 Months County(ies): All NYS counties Location: Westchester, NY
Bid Protests Not Available