Point Of Contact Not Available
SCOPE OF WORK CONSISTS OF: A new 63,520 square foot Cross-Dock Terminal A new 12,000 square foot Maintenance Facility 3. A new 4,000 square foot office 4. A Fuel Island Site development and improvements including all utilities Division 01 General Requirements: Surveying, Construction Waste Management and Disposal, Temporary Facilities and Controls, Temporary Utilities, Temporary Erosion and Sediment Control Division 2 Existing Conditions: Clearing & Grubbing Division 3 Concrete: Concrete Foundation Work, Cast-In-Place Concrete, Concrete Finishing, Structural Precast Concrete, Concrete Pavement, Curb and Gutter Division 4 Masonry: CMU Division 5 Metals: Miscellaneous Metal Work, Metal Stud Division 6 Wood and Plastics: Rough Carpentry, Plastic Laminated Clad Architectural Cabinets Division 7 Thermal and Moisture Protection: Sheet Waterproofing, Thermal Insulation, Board Insulation, Foamed-In-Place Insulation, Fully Adhered Roofing System, Metal Roof Panels, Sheet Metal Work, Roof and Wall Specialties and Accessories, Fire Safing, Joint Protection Division 8 Doors and Windows: Hollow Metal Doors and Frames, Overhead Coiling Doors, Entrances and Storefronts, Finish Hardware, Glazing Division 9 Finishes: Non-Structural Metal Stud Framing, Cementitious Backing Boards, Gypsum Assemblies, Gypsum Wallboard, Acoustical Panel Ceilings, Resilient Bases and Accessories, Exterior Painting and Finishing, Interior Painting and Finishing Division 10 Specialties: Signage, Toilet Compartments, Toilet Accessories, Fire Protection Specialties, Lockers, Ground-Set Flagpoles, Flags Division 11 Equipment: Loading Dock Equipment Division 12 Furnishings: Plastic Laminate-Clad Countertops Division 13 Special Construction: Metal Building Systems Division 14 Conveying Systems: N/A Division 21 Fire Suppression: Wet Fire Suppression System Division 22 Plumbing: Sanitary Plumbing Systems, Storm Plumbing Systems, Domestic Water Plumbing Systems, Fixtures and Equipment, Gas Piping, Air Compressors Division 23 HVAC: HVAC Equipment, Ductwork, Building Automation System, Testing and Balancing, Big Ass Fans Division 26 Electrical: Power Distribution Systems, Lighting (furnished by Owner), Lighting Controls, Fire Alarm Division 27 Communications: Data and Voice Communications, Telecommunication Pathways, Digital, Addressable Fire-Alarm System Division 31 Earthwork: Erosion Control, Site Work, Cut & Balance, Earth Work, Site Demolition, Paving Removal, Grading, Detention Pond Division 32 Exterior Improvements: Asphalt Paving, Concrete Walks, Concrete Curbs, Striping, Landscaping, Chain Link Fencing and Gates, Bollards, Striping Division 33 Utilities: Water Systems, Sanitary Sewerage Utilities, Site Storm Drainage Utilities
Bid Protests Not Available