The goal of this project is to abandon the existing Queen Lily Campground water source and install a new distribution system with all components tied into the existing North Fork Campground Water System. This is to be accomplished by demolishing the existing hydrants and drain infrastructure, filling in existing
valve boxes, capping the existing water distribution source, and installing new distribution line infrastructure. It is included as an option item to remove the existing Queen Lily water source above ground distribution
lines.