Morena Pipelines: The Morena Pipelines project includes the removal and replacement of 16” cast iron water distribution main with polyvinyl chloride (PVC) (approx. 14,686 LF) and the installation of a 36” Welded Steel Pipe water transmission main (approx. 18,308 LF) and associated appurtenances. The Morena Pipelines move north along Morena Boulevard and Old Morena Boulevard from Napa Street to Balboa Avenue. Phase 1 North City Pure Water Project, Morena Conveyance (BL): This project will install Class II (bike lanes) with buffer, bicycle loops, Sharrows and signage as per plan on the following roadway: Clairemont Dr between Iroquois Avenue and Denver Street and Morena Blvd between Balboa Avenue and Napa Street.
Bid Protests Not Available