The work of this project consists of repairing several isolated sections of the stone dike on Plymouth Long Beach, by retrieving stones that have been displaced during the winter storms of 2015, and re-shaping the stone dike to design dimensions. The work also will require the supply and installation of approximately 100 tons of new stone (3 to 6 tons each) as necessary, to complete the repairs. All of the repair areas are accessible by land equipment. Anticipated work window is October 1, 2016 to March 31, 2017.
Interested firms should submit a capabilities package to include the following: business classification (i.e. HUBZone, etc.), and what type of equipment would be utilized for this project. Firms must submit documented information that demonstrates experience with a minimum of two examples of construction projects, similar in scope and magnitude to this project that the firm has successfully performed in the last five years. The examples must clearly demonstrate stone structure repair projects for interlocked stone construction and demonstrate experience with acquiring and placing armor stones (with a minimum size of 6 tons) with land equipment and demonstrate experience in working in a dynamic and restricted marine environment (ocean waves, tides, time of year, etc.). Responses should include experience of Foreman and Crane Operators working on stone structures. Please indicate your team subcontractors that will be used to support your effort and include their prior experience and qualifications. Proof of bonding capability is required. Responses are due on March 11, 2016 by 3:00pm EST. Email responses to [email protected], ATTN: Robert C.Garrahan, Contracting Division. Responses are limited to twenty pages. This is a notice for sources sought only. This is not a request for proposal or invitation for bid. There is no bid package, solicitation, specification or drawings available with this announcement. It does not constitute a procurement commitment by the U.S. Army Corps of Engineers, implied or otherwise. No contract will be awarded from this sources sought announcement. Response is strictly voluntary; No reimbursement will be made for any costs associated with providing information in response to this sources sought announcement or any follow-up information requests. The results of this survey will be considered to be in effect for a period of one year from the date of this notice.