Owner: |
US Department of Labor (DOL)
|
Center Operator: |
Adams and Associates, Inc. |
Mailing Address: |
Woodland Job Corps Center 3300 Fort Meade Road Laurel, MD 20724 |
Site Visit: |
November 20, 2014 10:00 a.m. |
Proposal Due Date: |
December 1, 2014 |
Submission of Proposals: |
Woodland Job Corps Center Attn: Stacey Treasure, Purchasing Agent e-mail: [email protected] Fax: 301.362.4493 |
The only Bids that will be considered will be from vendors who attend the mandatory bid conference on the day and time specified above.
Project Summary:
The sink plumbing in Oak Dormitory consists of flexible plastic piping connecting the sink drain pipe to pvc trap. The flexible plumbing is not properly installed and is merely inserted into the pvc trap. This installation has allowed the drained water to leak inside the vanity cabinet. The leaking plumbing installation has caused permanent damage to the vanity cabinet and mold growth at the bottom of the cabinet. Contractor will replace flexible plumbing with hard schedule 40 plumbing.