2 EACH Pit Tempering Furnace per Watervliet Arsenal Manufacturing Enineering Work Group Specification # 15-24-3424( Attachment 0002), Revision Dated 09/30/2024 to include delivery, installation and training (Attachment 0001)
Contractor to include contract data prepared and delivered in accordance with CONTRACT DATA REQUIREMENTS LIST (DD FORM 1423) (Attachment 0003) which is attached hereto as EXHIBIT A (NOT SEPERATELY PRICED).