PLEASE EMAIL [email protected] WITH YOUR INTEREST IN RECEIVING AN RFP.
Note that the SOW, Specification and drawings may change at time of RFP issuance.
Scope of Work
All labor, equipment, transportation, overhead, bonding costs, safety oversight, quality control oversight, and supervision as required to mobilize, procure, and install the PIP-II Cryo Plant Electrical Make Ready Phase 3 work. This work primarily consists of electrical trades work removing and installing conduit, junction boxes, wire and motor controls.