The Contractor shall be required to provide the appropriate certified personnel, vehicles and equipment, and materials as necessary to install AutoScope video detection cameras on the existing mast arms for all four (4) approaches at the intersection of Phelan Road with Baldy Mesa Road in the Phelan area. The scope of services may include, but not be limited to the following: 1) The County shall provide a) Four (4) AutoScope video detection cameras with basic mounting brackets b) One thousand (1,000) feet of video cable c) One (1) AutoScope Comm Manager unit. d) All additional labor, equipment and/or materials associated with this project shall be provided by Contractor at no additional cost to the County. 2) The Contractor shall install County provided video cable in existing conduit. a) This may include clearing the existing conduit of debris and lubricating the cable prior to and/or during installation. Any labor, equipment and/or materials associated with this shall be provided at no additional cost to the County. 3) The Contractor shall install County provided cameras and mouting brackets on the signal mast arm at a location designated by the authorized representative for the County Traffic Division. a) Extension poles upt o 4 feet may be required as field conditions warrant. If needed, these shall be provided by the Contractor as well as any supplemental brackets and hardware. Any labor, equipment and/or materials associated with this shall be provided at no additional cost to the County. 4) The Contractor shall connect the County provided video cameras at the mast arm location and in the signal cabinet. a) Connections shall include wiring and securing of wires in a neat and weather resistant manner consistent with manufacturer's requirements. 5) The Contractor shall provide qualified staff and equipment to give on-site support for camera calibration and alignment at a time and date specified by the County. a) This is currently scheduled for March 30, 2020 from 8am to 10am 6) The Contractor shall be responsible for the work zone including providing and maintaining all traffic control associated with the required work at the intersection for the duration of the project. 7) Permits - The Contractor shall obtain an excavation permit issued by the Department of Public Works, Permits Section prior to the start of work. Permit shall be issued in the contractor's name and said contractor shall be responsible to abide by all conditions listed within the permit. The Permit cost not to exceed $300.00 shall be paid by the Contractor at no additional cost to the County.
Bid Protests Not Available