The Port of Vancouver Parcel 1A Trucking Project moves approx. 17,500 CY of stockpiled dirt material from Parcel 1A to Terminal 5 West using solo or super solo trucks with a minimum capacity of 12 CY; pup trailers are not permissible based on-site dimensions. Port crews will be responsible for loading the trucks from the established stockpile of excavated material on Parcel 1A. The project is estimated to cost $109,675 - $121,220.