The work to be done consists of furnishing all materials, equipment, tools, labor, and incidentals as required by the Plans, Specifications, and Contract Documents. The general items of work include, but are not limited to a concrete bicycle trail, new ADA curb ramps, storm drain improvements, installation of Rectangular Rapid Flashing Beacons (RRFB), and the associated striping as shown in the plans. The preparation includes removal of existing striping, relocation of existing signs and installation of new signs, clearing and grubbing, excavations and export, asphalt and concrete paving, removal and replacement of catch basins, storm drain, curb and gutter, AC overlay and other ancillary improvements as shown in the Plans and Specifications.